When does a possible client have to do the first payment?

Forums Engineering When does a possible client have to do the first payment?

  • Post
    Koen Wartena
    Participant
    NL
    Hi! I was wondering at which point/stage yacht designers or yacht builders ask a possible client for a first payment for the preliminary designs that are made.
    As the yacht designers and builders always do unpaid work for a possible client before they get the job of building another dream.
Viewing 1 replies (of 1 total)
  • Replies
Viewing 1 replies (of 1 total)
  • You must be logged in to reply to this topic.